An implementation engineer is tasked with setting up RecoverPoint for VMs on a 5-node V570F cluster.
How many VMs are licensed to be protected on the cluster?
- A . 5
- B . 15
- C . 25
- D . 30
A VxRail E560F model was delivered six months ago and is now scheduled to be installed with the target code.
What is the correct order of steps to complete this task?
What is the purpose of the As-Built Configuration Generator?
- A . Provide advanced control grouping for Stretched Clusters
- B . Capture and generate the installation workflow for review in the event of a failed deployment
- C . Create the customer deliverable documentation of the Dell EMC product/solution implementation
- D . Keep a record of all spare nodes, not yet added to a VxRail Cluster
A customer is performing self-deploy of a VxRail cluster. The VxRail Deployment Wizard fails to launch. The software appears to be corrupted.
What should they do to address the issue?
- A . Use the VMware Host Client and iDRAC to access the nodes and troubleshoot the issue.
- B . Verify that the Configuration file is not corrupt and has all the required values.
- C . Use the vSphere Client and troubleshoot the issue.
- D . Contact Dell support and request the nodes be reimaged.
What is the maximum number of supported nodes in a VxRail Stretch Cluster?
- A . 16
- B . 32
- C . 64
- D . 30
What must be enabled on ToR switch ports connected to VxRail nodes to support multiple VLANs?
- A . Access Mode
- B . Link Aggregation
- C . Trunk Mode
- D . Rapid Spanning Tree
Match each component of the VxRail HCI System Software to its description.
A VxRail Test Plan has been completed.
What is the protocol for recording the results?
- A . With the implementation team, complete and document each test, test date, and a screenshot of results
- B . In front of a customer, complete each test and document the test date
- C . With the implementation team, complete each test and document the test date
- D . In front of a customer, complete and document each test, test date, and a screenshot of results
Which two vSAN licenses include entitlement for VMware HCI Mesh? (Select 2)
- A . Standard
- B . Enterprise
- C . Enterprise Plus
- D . Advanced
Which command is used to restart the Loudmouth process on an ESXi node?
- A . /usr/IibAmiware/loudmouth/bin/loudmouthd restart
- B . systemcti restart loudmouth
- C . /etc/int.d/loudmouth restart
- D . systemcti restart vmware-loudmouth