DELL EMC D-VXR-DY-23 Real Exam Questions
The questions for D-VXR-DY-23 were last updated at Nov 19,2024.
- Exam Code: D-VXR-DY-23
- Exam Name: Dell Technologies VxRail Deploy 2023
- Certification Provider: DELL EMC
- Latest update: Nov 19,2024
What is the difference between Compression only and Deduplication and compression on a VxRail vSAN cluster?
- A . Compression only: A failed capacity disk causes the disk group to go offline
Deduplication and compression: A failed capacity disk does not impact the entire disk group - B . Compression only: Does not require a rolling reformat of the disks when enabled
Deduplication and compression: Requires a rolling reformat of the disks when enabled - C . Compression only: Added capacity disk requires a disk group rebuild
Deduplication and compression: Added capacity disk does not require a disk group rebuild - D . Compression only: A failed capacity disk does not impact the entire disk group
Deduplication and compression: A failed capacity disk causes the disk group to go offline
What is the correct sequence of steps to perform a RASR Factory Reset using an SD card?
What is the recommended way to power up VxRail E, V, P, and S Series nodes?
- A . Ensure the System Health indicator blinks amber for 10 minutes after power on
- B . Use the power button on the rear panel to power on each node
- C . Wait at least 30 seconds between powering up each node
- D . Use the iDRAC interface to power on each node
Use the VxRail simulator to explore the system.
What is the presented configuration? Note: It fs necessary to close (x) the simulator window before you can select a response to this question.
- A . Internal vCenter and external DNS
- B . Internal vCenter and Internal DNS
- C . External vCenter and external DNS
- D . External vCenter and internal DNS
How can an administrator limit IPv6 traffic created by VxRail nodes?
- A . Configure Link Aggregation
- B . Tag VLAN 3939 on the ToR switches
- C . Enable MLD snooping and querier
- D . Create a unique VLAN for IPv6 traffic
An implementation engineer is tasked with expanding an 8-node VxRail E560 cluster with an S570 node. The cluster has been configured with 1 GbE networking.
Which two should be considered when planning to expand the cluster? (Select 2)
- A . Node limit has been reached on the cluster
- B . AMD and Intel based nodes cannot be mixed
- C . E Series nodes require more capacity before expansion
- D . All nodes in the cluster must be the identical series
An implementation engineer is in the validation phase of a VxRail deployment with two Dell EMC ToR switches.
Which command should they run on each of the ToR switches to validate that Link Aggregation has been configured according to Dell best practices for VxRail node interfaces?
- A . show network-policy profile
- B . show interface
- C . show port-channel summary
- D . show interface status
An implementation engineer has just finished connecting a multi-rack VxRail cluster over a Layer 3 network. When attempting to migrate System VMs from the first rack to the second rack, they receive an error.
What is a possible reason for the error?
- A . vSphere DRS must be enabled
- B . System VMs must be on different subnets
- C . Only Layer 2 networking is supported
- D . System VMs must be on the same subnet
During a node add procedure the new node cannot be discovered. A ping to the IPv6 address is responding.
What could be the cause of this issue?
- A . Only one network interface is up on the new node
- B . vSAN VLAN is not configured correctly
- C . Management VLAN ID is not set on the vmk0 interface
- D . Loudmouth process is not running
What is validated by running the Proactive VM Creation test in vCenter on a VxRail cluster?
- A . vSAN operates successfully
- B . Network firewalls are configured correctly
- C . vSAN has sufficient storage capacity
- D . Network performance is sufficient