DELL EMC D-VPX-DY-A-24 Real Exam Questions
The questions for D-VPX-DY-A-24 were last updated at Dec 22,2024.
- Exam Code: D-VPX-DY-A-24
- Exam Name: Dell VPLEX Deploy Achievement
- Certification Provider: DELL EMC
- Latest update: Dec 22,2024
What are key benefits of storage virtualization with VPLEX?
- A . Ease of consolidations; device mobility; simplifying management; provisioning of multiple arrays.
- B . Consolidations; point-in-time backups; simplifying management; third-party array support.
- C . Device performance; point-in-time backups; third party array support; device mobility
- D . Synchronous SAN extension across long distances; device mobility; and third-party array support
medium-sized VPLEX clusters are connected via IP with a round-trip latency of approximately 35 ms.
What type of configuration is this?
- A . Geo
- B . Metro
- C . Local
- D . Global
A customer has a VPLEX Metro with VPLEX Witness installed and configured. The detach rule for consistency group is "no-automatic-winner".
What will VPLEX Witness do in case of a Site 1 failure?
- A . VPLEX Witness will have no effect.
- B . VPLEX Witness will set the consistency group detach rule.
- C . VPLEX Witness will suspend I/O at Site 1
- D . VPLEX Witness will suspend I/O at Site 2
You are configuring an FC Switch for a VPLEX implementation using VS2 engines. What is the required speed setting for the switch ports connected to the VPLEX FE ports in order to achieve the maximum throughput of VS2 engines?
- A . 8 Gbps
- B . 4 Gbps
- C . 16 Gbps
- D . 10 Gbps
When inspecting a VS1 director’s status LEDs, you see that a status LED is blue. What does this indicate?
- A . The VPLEX Standby Power Supply battery is low.
- B . GeoSynchrony code cannot be downloaded from the Management Server
- C . The director is downloading GeoSynchrony code from the Management Server.
- D . The VPLEX cannot connect with the other cluster
What is the purpose of the I/O Module Upgrade Script?
- A . To manage the I/O module change during a Metro to Geo topology upgrade.
- B . To install the I/O load balancer module on the Management Server.
- C . To configure the GbE I/O modules when installing VPLEX Geo.
- D . To automate the installation of I/O modules and configuration of the directors.
Which VPLEX component is configured with a public IP address during the installation process?
- A . LCOM Switch
- B . Director A
- C . Management Server
- D . Director B
VPLEX ndu pre-check command reports a time drift between directors and the Management Server. How must the NDU be performed?
- A . The NDU cannot be started. the time drift must be resolved.
- B . The NDU can be started using –skip-confirmations option.
- C . The NDU can be started. the time drift will be automatically fixed during upgrade.
- D . The NDU must be started using the –force option.
You need to claim storage that is presented to VPLEX from a VNX. What is required in order to create the mapping file needed by the VPLEX Claim Storage Wizard?
- A . A host with solutions enabler installed and zoned to SPA and SPB
- B . The user name, password and management address of the VNX
- C . A host with WinSCP installed, with an IP connection to the VPLEX Management Server
- D . The username and password of the VPLEX Management Server
You are preparing a site for a large Metro VPLEX cluster. The storage administrator wants to prepare the storage network configuration and needs to ensure easy troubleshooting of storage path faults.
How many WAN-COM zones will need to be created?
- A . 24
- B . 16
- C . 8
- D . 32