DELL EMC D-PE-OE-23 Real Exam Questions
The questions for D-PE-OE-23 were last updated at Nov 20,2024.
- Exam Code: D-PE-OE-23
- Exam Name: Dell Technologies PowerEdge Operate 2023
- Certification Provider: DELL EMC
- Latest update: Nov 20,2024
A technician is trying to troubleshoot a server that constantly keeps raising and lowering the RPMs of the fans.
The technician investigates and finds the following:
– No errors are displayed
– No obvious log entries exist concerning temperatures
– Server cover is installed and secured
– No expansion cards are installed
What would be the quickest action plan that the technician could attempt to try to fix the issue with the fans?
- A . Replace all the fans
- B . Upload the latest iDRAC firmware
- C . Replace the fans one at a time until the faulty fan is identified
- D . Adjust the Multi Vector Cooling values
A technician needs to remotely update the iDRAC with Lifecycle Controller firmware. They have downloaded the latest iDRAC firmware to the management station and connected to the iDRAC GUI.
What step is required to complete the update?
- A . Go to the Summary Page and reset the iDRAC
- B . Boot into the OS via Virtual Console and execute the firmware
- C . Go to the Firmware Update page and upload the iDRAC firmware
- D . Boot the server into F10 to start the firmware update
A technician needs to analyze a server that is using more power than expected. The server is part of a cluster that runs jobs between 8 AM and 5 PM. The cluster is not used at other times of the day. The server runs an unsupported OS. Performance while jobs are running is a key consideration.
Which option should the technician choose from within System Profile Settings within System Setup to address this issue?
- A . Dense Configuration
- B . Performance Per Watt (DAPC)
- C . Performance
- D . Performance Per Watt (OS)
A technician needs to update the iDRAC license on a PowerEdge R740 server from Express to Enterprise.
The server has the following components:
– 2x CPUs
– 384 GB RAM
– 6x 1 TB drives
– 1x PSU
The server is powered down but connected to active AC. The user wants it to stay powered down and not connect to any networks. No errors are presently displayed.
How can the technician upgrade the license?
- A . The license cannot be upgraded because the user will not allow the server to be powered on
- B . The license cannot be upgraded on a single PSU system
- C . Power on the server then connect to the iDRAC and upgrade iDRAC license before powering the server down
- D . Connect to the iDRAC GUI and upgrade the iDRAC license while the server is powered down.
A company’s servers were ordered with iDRAC Enterprise with vFlash. The server profile was backed up after the first boot. Changes have been made to the server BIOS settings and firmware versions, which have resulted in many performance issues.
What is the most efficient way for the technician to address the performance issues?
- A . Upload the approved corporate firmware versions from the file share
- B . Restore system profile using the iDRAC or Lifecycle Controller
- C . Run the racadm racresetcfg command to reset all server settings
- D . Reboot the server to F10 and perform System Repurpose/Retire
On a PowerEdge R640 server, the System Lockdown mode has been enabled. Certain features are no longer available in the System BIOS utility or IDRAC GUI.
Which other feature is no longer available?
- A . OMSA
- B . Lifecycle Controller
- C . iSM
- D . Booting to a 32-bit OS
A technician needs to initially configure a server from a bare metal condition in the following areas:
– Processor settings
– Disk configuration
– iDRAC network settings
The technician can only reboot once to achieve these tasks.
Where should the technician configure these settings? (Choose three.)
- A . PXE Settings
- B . System BIOS
- C . PERC Configuration Utility
- D . iDRAC Settings
- E . Device Settings
A technician needs to replace a server component with orange tabs/releases.
Which two steps should the technician take to complete this task? (Choose two.)
- A . Power off the server
- B . Remove power cables
- C . Cold swap the component
- D . Apply anti-static procedures
- E . Hot swap the component