SAP C_S43_2022 Real Exam Questions
The questions for C_S43_2022 were last updated at Dec 26,2024.
- Exam Code: C_S43_2022
- Exam Name: SAP Certified Application Associate - SAP S/4HANA Asset Management
- Certification Provider: SAP
- Latest update: Dec 26,2024
Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.
- A . An Inspection Plan and a technical object must be assigned to the same class.
- B . A PM task list with inspection point type must be assigned to the maintenance order
- C . An object list must have been generated manually or automatically.
- D . A checklist type must be assigned to the maintenance order header.
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?
- A . Via the SAP Fiori app "Manage Maintenance Order List"
- B . Within the SAP Fion-based background job
- C . Via the SAP Fiori app "Maintenance Scheduling Board"
- D . Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A . Planned date of the next call, independent of maintenance order dates
- B . Actual finish date of the maintenance order
- C . The date of the final confirmation
- D . Technical completion date of the maintenance order
Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question
- A . Generate Inspection Lols within the checklists view.
- B . Link PM task list with assigned inspection point type to a maintenance item.
- C . Record the usage decision for an Inspection Lot
- D . Generate Inspection Lots assigned to maintenance order headers.
You need to create a new functional location.
Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question
- A . Edit classification data and characteristics.
- B . Create a task list for functional location
- C . Assign documents
- D . Change a reference location.
- E . Assign a subordinate piece of equipment.
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question
- A . Add a serialized material to the equipment serial data view.
- B . Assign a serial number profile to an additional business view for equipment category
- C . Assign a serial number profile to the equipment category
- D . Assign a serial number profile to the related material master.
- E . Maintain a serial number for an existing equipment master.
You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months.
Which parameter do you have to use to map this in the system?
- A . Package hierarchy
- B . Scheduling indicator
- C . Maintenance package offset
- D . Cycle modification factor
What do you need to configure to enable entries in the action log of a piece of equipment?
- A . Define history related fields in the usage period customizing.
- B . Activate the change documents for the equipment category.
- C . Define the corresponding history related field for the equipment reference category.
- D . Activate the change documents for the equipment reference category.
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question
- A . If you use the Resource Scheduling apps, you always dispatch orders and operations.
- B . The order moves to the Preparation phase once it is approved and released
- C . Maintenance Planning Buckets give you a list of non-approved notifications
- D . The configuration of the order type decides whether you use Resource Scheduling or not.