How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,
- A . By Plant
- B . By Period
- C . By Industry
- D . By Material Status
For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis.
Which of the following do you have to consider? Note: There are 2 correct answers to this question.
- A . In pro duct-related COC, all costs are debited and credited to a product cost collector.
- B . Order-related COC is beneficial in a flexible production environment
- C . Product-related COC is used in manufacturing for co-products
- D . In order-related COC, individual production orders do NOT have cost segments.
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A . Move Time
- B . Pick/pack time
- C . Setup time
- D . Float before production
- E . Queue time
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A . Move Time
- B . Pick/pack time
- C . Setup time
- D . Float before production
- E . Queue time
During production order creation, several valid production versions are found.
How does the system choose the production version?
- A . Lot size or material cost
- B . Validity period or sales order
- C . Planned order or material number
- D . Alphanumeric or quota arrangement
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A . Order type
- B . Planning strategy
- C . Requirements profile
- D . Requirements type
Your project uses process orders for the production of liquid chemicals.
What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.
- A . Resource matrix
- B . Resource network
- C . Resource hierarchy
- D . Resource selection
in your Plant, MRP is activated.
which options do you have to exclude a material from the MRP run? Note: there are 2 correct answers to this question.
- A . Use a specific material status
- B . Use a specific material group
- C . Use a specific MRP type
- D . Use a specific MRP list
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A . The planned order is converted to a production order.
- B . The planned order’s component availability is checked.
- C . The planned order generates capacity requirements
- D . The planned order’s components are copied to the picking list.